Prosser Career Education Center
Staff Input per Category
- Functionality/Efficiency/Flexibility:
Safe storage (all programs, night programs, salt, etc.), overall, more space
for growing programs
- Collaboration/Connections: Open
shared makerspace, more or more efficient conference space
- Accessibility/Special Programming: Student
changing & prep areas
- Comfort & Well Being: Additional
restrooms in key locations
- Safety & Security: Parking,
traffic, & pedestrian circulation, building entrance safety, adjacent
ballfields/back of property safety, building flooding, outside awning for
students
Conditional Assessment (Overall Suitability: 78%)
Conditional Assessment Summary of Needs
- Site:
Recent building and site renovation and current improvements on west side.
Items that scored poorly include size of site (congested due to transportation
and ballfields), site directional signage, site access and traffic flow, site
perimeter fencing/security, dumpster area.
- Architectural: Building
exterior walls are in good condition at the new addition areas with the
exception of the metal panels on the west elevation. Exterior walls of
the original buildings are in fair condition especially the metal siding.
Windows and doors are in good condition and appear to have been replaced with
the 2018 renovation project. Roofing is spray foam insulation and is in fair to
good condition. Interior is in excellent condition.
- Interiors: Prosser is overall in great shape
finish wise. New finishes/ furniture was installed within 5 years and some
areas in child development were under renovation with new finishes and
casework. Some items, such as countertops in the cosmetology classrooms need to
be replaced because of damage from clips. Could use some paint touch up in
areas. Noted the welding lab had dangerous tripping hazards in the concrete
floor.
- Mechanical: The Central Plant is in need of two Boilers.
Two other Boilers, chillers, and pumps are in good condition. Vertical Unit
Ventilators are in good condition. Exhaust fans are in good condition; however,
two utility set fans were not functioning at the time of the visit.
- HVAC
Controls: New
Schneider Controls in 2019 throughout from 2019 renovation. Welding instructors
are not sure that welding lab is working correctly - more investigation would
be helpful. Controls for the chilled water system should also be investigated
to determine if improvements could be made. At the time of our visit, both
chillers were running, and the building was mostly empty.
- Electrical: Building in excellent condition, new distribution; new fire alarm; LED lighting with automatic controls; exterior lighting has BMS controls; original 1968 electrical distribution/switchboard should be replaced.
- Plumbing: Building in excellent condition, new domestic distribution system, fixtures, plumbing equipment, and sprinkler system. Incoming service pressure was noted to exceed code limit. Ensure domestic distribution system and equipment is regulated below 80psi. Some unnecessary amounts of piping in the equipment room(s) were exposed and uninsulated. This should be insulated for best operational efficiency. Gas piping at roof levels showed excessive rust.
- Technology:
- No electronic door monitoring. Staff walk around
building at day’s end to check doors.
- Video surveillance. A lot of blind spots around the exterior
of the buildings.
- Classroom A/V. In working condition but getting dated. They are planning projects to update.