Slate Run Elementary School
Staff Input per Category
- Functionality/Efficiency/Flexibility:
Size of classrooms (small), storage space needed, need space to grow (building
is full), better utilization of stage
- Collaboration/Connections: Support
staff space needs, space for small groups/testing, therapist, more flexible
spaces
- Accessibility/Special Programming: Playground
ADA accessibility
- Comfort & Well Being: Playground
shade areas, car rider awning, more flexible furniture, more outlets, Cafeteria
acoustics, faucets upgrades
- Safety & Security: Signage for
car riders, playground safety (mulch)
Conditional Assessment (Overall Suitability: 90%)
Conditional Assessment Summary of Needs
- Site: New building: site is in very good condition.
Items that scored poorly include site perimeter fencing, traffic flow,
playground surface (mulch).
- Architectural: Building
exterior walls / windows / doors are in excellent condition. Spray foam roof is
in excellent condition. Interior is in excellent condition.
- Interiors: Slate Run Elementary School moved
into a new facility in 2018, with all structures and furnishings being new as
of that date and are still in good condition.
- Mechanical: The Central Plant is in new condition,
including chillers, pumps, and boilers. Air Handling Units and split systems
are in new condition. Exhaust fans are in new condition. Classrooms are
conditioned by new vertical unit ventilators.
- HVAC
Controls: New
Schneider Controls in 2019.
- Electrical: Building in excellent condition, built in 2019.
- Plumbing: Building in excellent condition, built in 2019. Even though it is a newer, the above section about the spray foam roof applies to this school.
- Technology:
- No electronic door monitoring. Staff walk around
building at day’s end to check doors.
- Video surveillance. A lot of blind spots around the exterior
of the buildings.
- Classroom A/V. In working condition but getting dated.
They are planning projects to update.